4 MW solar for Malaysia's steel giant
How i2 Energy designed and delivered a 4 MW solar solution for Alpine Pipe Manufacturing, the largest producer of electric resistance welded (ERW) steel pipes and tubes in Malaysia.


k0vmO3ucQtI
Film transcript
Narrator: Leading Malaysia steel industry, Alpine Pipe Manufacturing stands out as the largest producer of electric resistance welded steel pipes and tubes in the country. As a subsidiary of Hiap Teck Venture Berhad, it is the first in Southeast Asia to invest in state-of-the-art technology. This cutting-edge technology allows the manufacturing of 18-inch diameter steel pipes. It showcases a strong commitment to advancing industrial capabilities. i2 Energy was entrusted to design and implement a bespoke energy solution to support Alpine’s, large scale operations. Focusing on sustainability, this solution was tailored to meet Alpine’s substantial energy demand by relying more on renewable energy sources,
Kenzie: We have successfully installed a four-megawatt solar system for Alpine. Our solar design was optimized to maximize solar generation while minimizing power loss across the site. This massive project lasted six months over a large 67 acres footprint. Its execution was quite unique in complexity, because Alpine has a tight workspace which requires precise logistics management, we believe that the critical success factor for this project delivery was communication. So, what we did was we provided our project execution plan ahead of time, which was monitored closely by both parties to ensure proper alignment. Clear communication allowed all parties to stay informed and adapt and adjust to any necessary changes during project implementation. Having an in-house site safety supervisor, we are able to meet all conditions set by Alpine’s robust internal safety requirements such as weekly inspections and designated safety protocols. i2 Energy’s solar solution for Alpine is expected to reduce Alpine’s electricity consumption by up to 30% while supporting their ESG goals.
Narrator: Today, Alpine is leading the way in sustainability by fully embracing environmental, social and governance principles. Their commitment goes beyond business. It's setting a new industry standard and inspiring others to follow you.
Watch by topic
Short vertical cutdowns from the film, each on one angle. Tap any cover to watch.
Alpine Pipe Manufacturing: Precision & Planning
EZ9R780NVEk
Alpine Pipe Manufacturing: 4MW Solar System
qv1x7uYvYC4
Alpine Pipe Manufacturing: The Industrial Giant
QZzcLp857Wk
Alpine Pipe Manufacturing: Safety & Sustainability
XKJGi1j0ebc
i2 Energy designed and delivered a 4 MW rooftop solar system for Alpine Pipe Manufacturing, Malaysia's largest ERW steel pipe and tube producer. The installation offsets a major share of the plant's daytime electricity demand and advances Alpine's decarbonisation goals.
The challenge
Steel manufacturing is among the most energy-intensive industries in Malaysia, and with electricity tariffs climbing, a producer running around the clock feels every rate change on the bottom line. As the country's largest manufacturer of electric resistance welded (ERW) steel pipes and tubes, Alpine Pipe Manufacturing operates a vast facility where uptime is everything and any disruption to production carries a real cost.
At the same time, customers and regulators are paying closer attention to how heavy industry manages its carbon footprint. Alpine wanted to cut its energy spend and strengthen its sustainability position without slowing a demanding, continuous production environment, so any solar solution had to be engineered around the realities of a working steel plant.
The results
Working through its EPCC model, i2 Energy designed and delivered a 4 MW rooftop solar system for Alpine, engineered around a tight, complex site with zero room for error. The installation was executed to strict safety standards while production continued underneath, with no interruption to Alpine's operations.
The system cuts Alpine's electricity consumption by up to 30%, reducing reliance on the grid, lowering energy costs, and cutting carbon emissions; proof that even the most energy-intensive heavy industry can scale sustainability without compromising output. AI-driven monitoring keeps the array performing at its designed yield over the long term.
i2 Energy’s solar solution for Alpine is expected to reduce Alpine’s electricity consumption by up to 30% while supporting their ESG goals
General Manager, i2 Energy
Work with i2
Considering solar for your facility?
We're your solution.
i2 Energy delivers solar EPCC solutions for commercial, industrial, and utility-scale applications.
Reach out for a free assessment.
Call or text us
+60 10-281 7802